LYSANDER · EXPANSION PLANNING

New base planner

One build order, parallel research. Keep your empire producing while the new base grows.

Construction-first relocation Reusable order for non-research bases

Metal Refineries 6 → Spaceport 1 → Shipyard 1 → construction push → income → stronger shipyards. Power, population and area upgrades are inserted where your astro needs them.

Edit the full order ↓

The example uses 5,000 credits for one base, commander 5 already present, Energy 20 / Computer 20 / Laser 18 / AI 6 / Cyber 0. Apply relocation defaults keeps your inputs and replaces the building order, with Robotics 7. Customize final levels in Construction goals below. Ship production spending is switched off to fund construction; early Shipyard 1 opens the option to build ships.

Tuned for M4 relocation astros; a staged recommendation, not a proven optimum. No labs or androids are added. Research and other work already queued stay in the plan. These forecasts cover one base; they do not model ten bases sharing 50k or a commander arriving later.

Your new base Astro, credits and research

Adds 20 to unmodified construction before technology and other capacity bonuses. The normal 20 becomes 40. If you already included this bonus in the starting-construction field, remove it there before enabling this option.

Your current research Blank levels count as zero

Enter levels already completed across your empire. Add future levels to the research queue below; their bonuses and building unlocks apply when that research finishes.

Starting structures and calculation settings

The starting state uses Urban 1, 2 unmodified energy and 20 construction/hour, plus 20 when Home base is selected. Check these against your game; change them here or enter already-built structures. Personal economy and production figures start blank. Enter future construction goals below ↓

Construction goals Final structure levels you want to reach

Enter the final level you want for each structure. The planner builds from the starting structures entered above and adds missing power, population and area support.

Loaded plans show their queued final levels here. Blank or zero adds no goal for that structure. Generate replaces the building order; it does not change your starting structures.

View the build order ↓

The generated order favors low cost per construction gain. Review and edit its sequence in Your single build order.

Existing bases · keep 100% production Enter each base’s income and full production

Construction gets only what is left after full production. Enter each base separately or put your existing empire total in one row.

BaseEconomy / hourFull production / hour

New-base production begins with Shipyards 1 + Laser 1. Otherwise it remains capacity only. Existing bases always spend their entered full production amount.

Research plan 0 levels · runs alongside construction

Research and scheduled commander training run alongside your building order. Both use the same credits while full production stays funded. A building waits if its required technology is still being researched.

For this new base, the forecast uses its completed labs and updates research speed as more labs finish. An existing research base keeps its entered labs; AI upgrades increase its capacity. Enter a capacity override for established research links; put the research commander in its separate level field. Choose This new base to wait for labs in your building order.

Each step researches one next level. Adding research includes missing technology prerequisites; Add required research covers the buildings in your order. Check the lab requirements and move steps into the order you want. Construction follows its listed order while it waits.

Research costs and parallel completion forecast
StepTechnology / levelCostResearch timeStart / pay → finishAfter paying / finishOrder

No research queued. Your current technology levels stay unchanged.

Production & base 2 Optional expansion goal

Explicit production pays upfront and occupies the base's production capacity; other construction and research keep running. Turn off the new-base full-production budget to avoid counting the same spending twice. Goods cost 20 and return 21 only when finished. Tutorial payouts are sequential and assume prompt manual claims. Movement/retirement are planning assumptions; no game actions are performed. The expansion goal includes the ship and available founding credits, with flight and placement left separate.

OrderUnit / GoodCostStart / pay → finishBank at finishMove / remove

Construction & research commanders Compare training cost, savings and affordability

Enter your current assigned levels, then optional training targets. Each level pays its credit or XP cost when training starts. Its discount applies only after completion, to jobs purchased afterward. Already-paid work keeps its original price and remaining work.

Training runs alongside construction and research. Choose Commander training first above to prioritize its purchases; otherwise the selected work lane and the other work lane buy first. If both commanders need funds, construction training buys first. New recruits require a completed Command Center, cost level 1 at recruitment and take 10 minutes to arrive from the pool before their first discount is active. Higher training keeps the old level active until the course ends.

One assigned commander per base. If research uses this new base, compare the two roles as alternatives. Recruitment needs a Command Center; the role's existing level is treated as already recruited. Training has no upkeep, but XP is a separate resource.

Scheduled training

Commander / levelCredits / XPCredit wait / other waitStart & pay → activeBank before → after paying

No training scheduled. Enter a target above the current assigned level.

After-training cost comparisons Separate what-if cases

Set up your astro, funding and queues to compare commanders.

These comparisons ignore scheduled training targets and assume the compared level is already assigned at plan start. Use Scheduled training above and Plan timeline below for actual payments, waits and discount activation. Funds-in time assumes you pause purchases, keep initial income and full production, and protect the reserve through the next income tick. New buildings/research may change that estimate. A positive net means listed-job discounts cover training at your chosen XP valuation; it does not prove the fastest strategy. Earlier income from faster buildings is not counted. The 48-hour assignment lock and inability to remove a commander during matching work still apply.

Game commander rules ↗ · AEBits v5 cost check ↗

Your single build order No steps yet

For this base only. Assumes filled routes at Spaceports 1, 5, 10, 15… Setup is paid when the upgrade completes; income begins at the next hourly tick. Starting routes are treated as already paid.

Edit construction goals ↑ to generate an order from the levels you want to reach.

Reference: MR 8 / RF 4 / SY 8 / RL 8; no tutorial rewards or startup research.

Enter the astro’s resources and starting credits, then add your build steps.

Plan timeline Payments, completions and discount activation

Times are elapsed from the start of the plan. All completions at a timestamp happen before the next purchases. Continuous production spending is already included in each displayed bank.

TimeEventCreditsXP spentBank after eventXP left

Editable build queue and funding forecast
StepUpgrade / levelCostStart → finishBankNew base · income / prod / consOrder

Add upgrades above, generate from your target levels, or use the reference order. Each row expands to show its resources and funding.

Calculation notes and sources

Existing-base economy and production are held constant. Production is budgeted at full capacity; it is never turned down to fund construction. Income arrives at each hourly tick. Production spending is spread across the hour as a budget estimate; actual ship orders charge credits upfront.

Each upgrade is paid upfront. Construction waits for funds and reserves enough to cover full production through the build and its following income tick, plus your chosen cash reserve. Energy, population, area and technology prerequisites are checked in order. Research runs on a separate queue and shares the bank with construction. Each research level is paid upfront. Construction waits for a queued technology to complete; unrelated work can finish in the other queue. Neither queue skips its listed order. A permanent blocker is reported without invented later completion times.

Structure costs use the initial price × 1.5current level, rounded up. Construction time uses cost ÷ construction, with Cybernetics and your separate construction-capacity bonus; assigned construction commanders discount job price instead of increasing capacity; applicable orbital upgrades use Anti-Gravity (5% per level, capped at 90%). Energy uses its 5% research bonus. Base output grows only after an upgrade completes. New Capital levels add +1 to every entered existing base.

Existing empire trade income is entered separately and added once. The new base estimates income per route (default 12 credits/hour, editable; 0 excludes it), with one route at Spaceports 1 and another at each multiple of 5. Each slot is assumed filled immediately; its setup estimate (default 50 credits, editable) is charged once when the unlocking upgrade completes, and its income begins at the next hourly tick. Routes available in the starting structures are treated as already paid. Enter 0 income per route to exclude both new-base trade income and setup costs. Actual income depends on the trading bases, distance and trade network. Research uses the initial technology price × 1.5 to the current level, discounted by the assigned research commander, rounded up, then divided by the selected base’s research capacity. Research Labs requirements and prerequisite technologies are checked. Current levels are not charged again. This models full new research levels; already-paid or partly completed research is not imported. AI and Energy bonuses apply after completion. Cybernetics updates construction and fully funded production, including the entered existing-base capacities. By default, work already running uses changed capacity for its remaining work. Optional guide timing mode holds the capacity quoted at each job start and rounds the duration up to a whole second. The reference also uses downward energy-capacity rounding; older plans retain nearest-integer energy unless changed. Existing research links can be represented in the entered current research capacity; a research commander belongs in its separate level field, not in capacity; new links are not created automatically. Actual route distances and partner income, loot, fleet travel, occupation losses and queues already running are excluded. The founding cost is optional and entered manually.

Home base adds 20 construction/hour before Cybernetics and your capacity multiplier. Normal starting construction stays at 20; remove any manual home bonus before selecting it.

Optional production orders charge their unit cost upfront. Goods cost 20 and return 21 only on completion. Turn off the new-base full-production budget for this mode to avoid double counting; entered existing-base production stays fully funded. Orders wait for completed shipyard and technology prerequisites. Optional earliest-start times delay payment in that queue while other queues keep running.

The optional base-2 goal stops when an Outpost Ship is complete and the entered founding fee is available in addition to the cash reserve. The fee is reserved, not spent before flight and placement. Tutorial mode assumes prompt manual claims of the reference missions in order. Corvette movement, return and retirement are entered assumptions; no game actions are performed. The base-2 reward is shown separately only after founding, never borrowed to fund the fee. Tutorial amounts and claiming behavior can differ from the reference; check your game. The guide trade curve (4–7 per route) is an optional matched-partner source comparison, not a universal trade formula; it uses your setup estimate. Six per route persists through 22 structure economy; seven starts at 23.

Matched reference examples: Download exact Uriel plan · Download reference + spare Good. Use Load plan to import either file. Both use an Earthly home base, 180 opening credits, a one-minute opening delay, two 8-credit trades and a 50-credit founding fee. The exact reference finishes at 18h 05m with 89 credits; the spare-Good example has 90 at the same time. Tutorial claims and immediate Corvette actions are reference assumptions.

The initial state is an editable planning assumption. The supplied reference is an account-opening order; the reference-order button loads only its construction sequence. Tutorial payouts and production must be selected separately. No fastest or optimal build is claimed.

Cosmos structures ↗ · Research bonuses ↗ · Hourly income ↗ · Trade route rules ↗ · Home base construction bonus ↗ · 20-credit starting construction ↗ · Supplied build reference ↗